  • (a) New residential construction. An electrical permit fee schedule for new residential construction is established as follows:

    Square Feet of Living Area Permit fee to
    Nearest Dollar
    1—440 ..... $ 2.00
    441—562 ..... 4.00
    563—687 ..... 5.00
    688—812 ..... 6.00
    813—937 ..... 7.00
    938—1062 ..... 8.00
    1063—1187 ..... 9.00
    1188—1312 ..... 10.00
    1313—1437 ..... 11.00
    1438—1562 ..... 12.00
    1563—1687 ..... 13.00
    1688—1812 ..... 14.00
    1813—1937 ..... 15.00
    1938—2062 ..... 16.00
    2063—2187 ..... 17.00
    2188—2312 ..... 18.00
    2313—2437 ..... 19.00
    2438—2562 ..... 20.00
    2563—2687 ..... 21.00
    2688—2812 ..... 22.00
    Reinspection fee ..... 15.00

     

    (b) The fee schedule for residential renovation and commercial construction shall be as follows:

    For issuing each permit .....$15.00

    In addition:

    Change or move service-single .....1.00

    Two (2) or more at the same time and place, each .....1.00

    Openings, each .....0.10

    Fixtures, each .....0.10

    Range, water heater, dryer, or welder, each .....0.25

    Gasoline pumps, each .....0.25

    Motors, generators, or transformers, fractional sizes, each .....0.10

    Other motors, generators, or transformers per H.P. or K.W., each .....0.10

    Maximum fee for any one motor .....5.00

    Signs, per circuit or sign transformers, each .....0.25

    Any electrical opening not listed, each .....0.25

    Electric passenger elevator installation .....5.00

    Electric Freight elevator installation .....3.00

    Minimum fee for any permit .....2.00

    (c) The fee schedule for new commercial construction is established as follows:

    For issuing each permit .....$30.00

    In addition:

    Change or move service-single .....1.00

    Two (2) or more at the same time and place, each .....1.00

    Openings, each .....0.10

    Fixtures, each .....0.10

    Range, water heater, dryer, or welder, each .....0.25

    Gasoline pumps, each .....0.25

    Motors, generators, or transformers, fractional sizes, each .....0.10

    Other motors, generators, or transformers per H.P. or K.W., each .....0.10

    Maximum fee for any one motor .....5.00

    Signs-per circuit or sign transformers, each .....0.25

    Any electrical opening not listed, each .....0.25

    Electric passenger elevator installation .....5.00

    Electric freight elevator installation .....3.00

    Minimum fee for any permit .....2.00

    (d) Exemptions. The city, the county, the state and the United States of America shall be exempt from the paying of any fee for any electrical permit, but shall be required to obtain a permit.

(Ord. No. 7708, § 39, 3-3-77; Ord. No. 8010, § 1, 9-4-80)