§ 7-12. Moving meter locations.
Latest version.
When meters are moved from inside to outside locations in existing construction, metal raceway will not be required if fused panel or circuit breakers are also moved to the outside and the existing service conductors from old panel location are used as branch circuit conductors from new to old panel or switch, or if fused switch or breaker is installed outside to protect existing feeders to existing panel or breaker.
(Ord. No. 7708, § 54, 3-3-77)